# KAEFER secures ductwork fabrication contract for Hinkley Point C nuclear power station

KAEFER UK & Ireland secured a contract with NNB GenCo (EDF Energy) to supply welded steel ductwork for the Hinkley Point C nuclear power station in Somerset, UK. The ductwork will be fabricated at KAEFER's Jarrow facility, creating over 40 skilled jobs.

- Type: Contract
- Announced: 2021-03-15
- Where: Jarrow, England, United Kingdom
- Jobs: 40
- Status: announced
- Products: welded steel ductwork
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [KAEFER UK & Ireland](https://endata.com/companies/53836.md) (supplier)
- [NNB GenCo (EDF Energy)](https://endata.com/companies/53837.md) (customer)

## Sources

- [kaeferltd.co.uk](https://kaeferltd.co.uk/kaefer-in-the-uk-secures-major-ductwork-fabrication-contract-for-hinkley-point-c-with-nnb-genco-edf-energy/), 2021-03-15: "We are delighted to have signed this contract for the supply of nuclear ductwork with NNB GenCo."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
