# Mueller Systems to deploy AMI network for Calaveras County Water District

Mueller Systems was selected by Calaveras County Water District to deploy an advanced metering infrastructure (AMI) network covering 1,000 square miles with 13,000 AMI endpoints. Deployment begins in early Spring 2021 and is expected to be completed by end of 2021.

- Type: Contract
- Announced: 2021-03-09
- Where: Calaveras County, California, United States
- Status: announced
- Capacity: 13,000 AMI endpoints
- Products: advanced metering infrastructure, Mi.Net AMI solution, Sentryx software
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Mueller Water Products](https://endata.com/companies/708.md) (supplier)
- [Calaveras County Water District](https://endata.com/companies/53730.md) (customer)

## Sources

- [globenewswire.com](https://www.globenewswire.com/news-release/2021/03/09/2189607/14520/en/mueller-awarded-contract-for-ami-deployment-in-calaveras-county-ca.html), 2021-03-09: "The Mi.Net AMI solution provides us with a cost-effective path forward to meet these goals and enhance customer service."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
