# Hitachi ABB Power Grids wins order for Dogger Bank C offshore wind link

Hitachi ABB Power Grids has won a contract from Dogger Bank Wind Farm to connect the third transmission link (C1) of the world's largest offshore wind farm, with 3.6 GW capacity, to the UK mainland using HVDC Light technology. The contract is subject to financial close of the third phase, forecast for late 2021.

- Type: Contract
- Announced: 2021-02-17
- Where: North Sea (offshore), UK mainland, United Kingdom
- Status: announced
- Capacity: 3.6 GW
- Products: HVDC Light transmission system, offshore wind farm connection
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Eni](https://endata.com/companies/1667.md) (investor)
- [Equinor](https://endata.com/companies/1741.md) (partner)
- [SSE Renewables](https://endata.com/companies/5722.md) (partner)
- [Hitachi ABB Power Grids](https://endata.com/companies/8446.md) (supplier)
- [Dogger Bank Wind Farm](https://endata.com/companies/49054.md) (customer)

## Sources

- [hitachienergy.com](https://www.hitachienergy.com/uk-ie/en/news-and-events/press-releases/2021/02/hitachi-abb-power-grids-accelerates-uk-green-energy-transition-with-a-new-contract-for-the-world-s-largest-offshore-wind-farm), 2021-02-17: "Hitachi ABB Power Grids has today announced that it has won another major order from Dogger Bank Wind Farm to connect the third transmission link from the world’s largest offshore wind farm over 130 km to the UK mainland."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
