# Yokogawa wins control system order for Lahendong geothermal plant in Indonesia

PT Yokogawa Indonesia received an order from PT Pertamina Geothermal Energy to replace control systems for the steamfield above ground system at the Lahendong geothermal power plant in North Sulawesi. Yokogawa will supply CENTUM VP system, wireless transmitters, pressure transmitters, and flowmeters for units 1-4.

- Type: Contract
- Announced: 2021-02-08
- Where: North Sulawesi Province, Indonesia
- Status: announced
- Capacity: 120 MW
- Products: CENTUM VP integrated production control system, wireless transmitters, pressure transmitters, flowmeters
- Sectors: [Automation and Robotics](https://endata.com/sectors/automation-robotics.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Yokogawa Electric Corporation](https://endata.com/companies/1434.md) (supplier)
- [PT Pertamina Geothermal Energy](https://endata.com/companies/53096.md) (customer)

## Sources

- [industry-asia-pacific.com](https://www.industry-asia-pacific.com/news/36413-yokogawa-wins-control-system-and-integration-service-order-for-lahendong-geothermal-power-plant-in-indonesia), 2021-02-08: "Yokogawa will supply the CENTUM VP integrated production control system and a large number of wireless transmitters, pressure transmitters, and flowmeters for the SAGS of units 1-4."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
