# Aggreko signs contract with Gold Fields for 25.9 MW hybrid power solution at Salares Norte mine

Aggreko signed a contract with Gold Fields to provide a 25.9 MW hybrid solar and thermal power solution for the Salares Norte open-pit mine in Chile, comprising 16 MW diesel gensets and 9.9 MW solar units.

- Type: Contract
- Announced: 2021-01-20
- Where: Salares Norte mine, Andes, Chile, Chile
- Status: announced
- Capacity: 25.9 MW
- Products: hybrid solar and thermal power solution, diesel gensets, solar power units
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Aggreko](https://endata.com/companies/10070.md)
- [Aggreko](https://endata.com/companies/10070.md) (supplier)
- [Gold Fields](https://endata.com/companies/24226.md) (customer)

## Sources

- [im-mining.com](https://im-mining.com/2021/01/20/aggreko-energise-gold-fields-salares-norte-mine-hybrid-power-solution/), 2021-01-20: "Aggreko, a leading provider of mobile and modular power solutions, has signed a contract with Gold Fields to provide a 25.9 MW hybrid solar and thermal power solution to the Salares Norte open-pit mine in Chile."
- [pv-magazine.com](https://www.pv-magazine.com/2021/01/22/new-heights-of-solar-aggreko-to-install-25-9-mw-hybrid-solar-system-at-4500-m/), 2021-01-22: "Aggreko has signed a 10-year contract with the global gold miner to install at 25.9 MW hybrid solar and thermal power solution at its Salares Norte mine site"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
