# Axine Water Technologies opens assembly facility in Metro Vancouver

Axine Water Technologies opened a 10,000 square foot assembly facility in Metro Vancouver to manufacture, assemble, and test wastewater treatment systems.

- Type: Expansion
- Announced: 2021-01-05
- Where: Metro Vancouver, Canada, Canada
- Status: completed
- Capacity: 10,000 square foot facility
- Products: wastewater treatment systems
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Axine Water Technologies](https://endata.com/companies/52289.md)

## Sources

- [axinewater.com](https://axinewater.com/2020-highlights-establishing-a-foundation-for-sustained-growth-momentum/), 2021-01-05: "We opened a 10,000 square foot assembly facility in Metro Vancouver to manufacture, assemble, and test wastewater systems before shipment to customer sites."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
