# Mitsubishi Power to supply gas turbines for Capital Power repowering project

Capital Power has ordered two Mitsubishi Power M501JAC gas turbines to repower its Genesee units 1 and 2 in Alberta, converting from coal to natural gas. The repowered plant will provide 1,360 MW of capacity, with Unit 1 completion in 2023 and Unit 2 in 2024.

- Type: Contract
- Announced: 2021-01-04
- Where: Alberta, Canada
- Jobs: 500
- Status: announced
- Capacity: 1,360 MW
- Products: M501JAC gas turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Mitsubishi Power](https://endata.com/companies/7073.md)
- [Mitsubishi Power](https://endata.com/companies/7073.md) (supplier)
- [Capital Power Corporation](https://endata.com/companies/22368.md) (customer)

## Sources

- [power-eng.com](https://www.power-eng.com/gas/turbines/mitsubishi-supplying-pair-of-m501jac-gas-turbines-for-capital-power-repowering-coal-conversion-project/), 2021-01-04: "Capital Power is following a strategy toward a low-carbon future with a target to be net carbon neutral before 2050."
- [coalage.com](https://www.coalage.com/departments/world-news/capital-power-orders-2-mitsubishi-power-gas-turbines-to-achieve-carbon-neutral-goal/), 2021-02-12: "The repowering of Genesee Units 1 and 2 with Mitsubishi Power technology will position the Genesee station to be off coal in 2023."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
