# Mitsubishi Power wins gas turbine supply contract from Capital Power for Genesee repowering

Mitsubishi Power won a contract from Capital Power to supply two M501JAC gas turbines for repowering Genesee Units 1 and 2 in Alberta, Canada from coal to natural gas. The project will have 1,360 MW net capacity and create nearly 500 jobs during peak construction.

- Type: Contract
- Announced: 2020-12-24
- Where: Alberta, Canada, Canada
- Jobs: 500
- Status: announced
- Capacity: 1,360 MW
- Products: M501JAC gas turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Mitsubishi Power](https://endata.com/companies/7073.md) (supplier)
- [Capital Power Corporation](https://endata.com/companies/22368.md) (customer)

## Sources

- [power-technology.com](https://www.power-technology.com/news/mitsubishi-power-capital-power/), 2020-12-24: "Capital Power is following a strategy toward a low-carbon future with a target to be net carbon neutral before 2050."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
