# Mitsubishi Power receives order for FGD systems at Nikola Tesla B plant in Serbia

Mitsubishi Power has received an order for two sets of flue gas desulfurization systems for the Nikola Tesla B coal-fired power plant in Serbia, each with 670 MW capacity, with operation scheduled to start in 2024.

- Type: Contract
- Announced: 2020-10-22
- Where: Nikola Tesla B power plant, near Belgrade, Serbia
- Status: announced
- Capacity: 670 MW per unit
- Products: flue gas desulfurization systems
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Mitsubishi Power](https://endata.com/companies/7073.md) (supplier)
- [Public Enterprise Electric Power Industry of Serbia](https://endata.com/companies/50697.md) (customer)

## Sources

- [powermag.com](https://www.powermag.com/press-releases/mitsubishi-power-receives-follow-up-order-from-serbia-for-two-sets-of-worlds-largest-flue-gas-desulfurization-systems/), 2020-10-22: "Mitsubishi Power, a subsidiary of Mitsubishi Heavy Industries (MHI) Group, has received an order for two sets of one of the world’s largest flue gas desulfurization (FGD) systems for the Nikola Tesla B coal-fired power plant in Serbia."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
