# Siemens wins contract for Golden Pass LNG boil-off gas compressor trains

Siemens Gas and Power will supply three cryogenic boil-off gas compressor trains, plus motors and steam turbine generator sets, for the Golden Pass LNG export terminal in Sabine Pass, Texas. The contract was awarded by CCZ JV, reported on 2020-05-27.

- Type: Contract
- Announced: 2020-05-27
- Where: Sabine Pass, Texas, United States
- Status: announced
- Products: boil-off gas compressors, electric motors, variable speed drives, steam turbine generator sets
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md), [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Siemens](https://endata.com/companies/301.md) (supplier)
- [CCZ JV](https://endata.com/companies/6544.md) (customer)

## Sources

- [offshore-energy.biz](https://www.offshore-energy.biz/siemens-scores-golden-pass-lng-compression-gig/), 2020-05-27: "Siemens Gas and Power has secured a contract for the supply of three cryogenic boil-off gas (BOG) compressor trains for the Golden Pass LNG export terminal."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
