# Siemens Gas and Power to supply compressor trains for Golden Pass LNG export terminal

Siemens Gas and Power won a contract from CCZ JV to supply three cryogenic boil-off gas compressor trains for the Golden Pass LNG export terminal in Sabine Pass, Texas, with each package driven by a 6.8 MW electric motor.

- Type: Contract
- Announced: 2020-05-27
- Where: Sabine Pass, Texas, United States
- Status: announced
- Capacity: Three liquefaction trains, each about 5.2 million metric tons per annum
- Products: boil-off gas compressor trains, electric motors, variable speed drives, steam turbines
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Golden Pass LNG](https://endata.com/companies/4588.md)
- [McDermott International](https://endata.com/companies/2424.md) (partner)
- [Zachry Group](https://endata.com/companies/2528.md) (partner)
- [Chiyoda International Corporation](https://endata.com/companies/2529.md) (partner)
- [Siemens Gas and Power](https://endata.com/companies/6452.md) (supplier)
- [CCZ JV](https://endata.com/companies/6544.md) (customer)

## Sources

- [press.siemens.com](https://press.siemens.com/global/en/pressrelease/siemens-wins-compression-contract-golden-pass-lng-export-project), 2020-05-27: "Siemens Gas and Power was awarded a contract from CCZ JV to supply three cryogenic boil-off gas (BOG) compressor trains for the Golden Pass LNG export terminal in Sabine Pass, Texas, USA."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
