# Aker Solutions wins EPCI contract for Edvard Grieg platform electrification

Lundin Energy let an EPCI contract to Aker Solutions for integration of a high-voltage electrical boiler package to electrify the Edvard Grieg platform in the North Sea. The work starts immediately and will make the platform fully electrified by 2022.

- Type: Contract
- Announced: 2020-09-29
- Where: North Sea, 180 km west of Stavanger, Norway
- Jobs: 50
- Status: announced
- Products: high-voltage electrical boiler package
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Aker Solutions](https://endata.com/companies/1742.md)
- [Lundin Energy](https://endata.com/companies/50106.md) (customer)

## Sources

- [ogj.com](https://www.ogj.com/general-interest/article/14184340/lundin-lets-contract-for-edvard-greig-platform-electrification), 2020-09-29: "Lundin Energy let an engineering, procurement, construction and integration (EPCI) contract to Aker Solutions for the integration of a high-voltage electrical boiler package as part of the electrification of the operator’s Edvard Grieg platform."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
