# Boreton starts production of electric loaders in Shanting, Zaozhuang

Boreton Technology invested 330 million yuan to build a new energy electric equipment project in Shanting District, Zaozhuang. Phase 1 completed with 50 million yuan investment, producing 15 electric loaders by July 2020, achieving China's first mass production of pure electric loaders. Phase 2 will produce 1,500 electric loaders, trucks and mining trucks annually.

- Type: New facility
- Announced: 2020-09-27
- Where: Shanting District, Zaozhuang, Shandong, China
- Value: $48.0M (330.0M CNY)
- Jobs: 100
- Starts operating: Jul 2020
- Status: under construction
- Capacity: 1,500 units per year (Phase 2)
- Products: pure electric loaders, electric trucks, electric mining trucks
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Boreton Technology](https://endata.com/companies/50175.md)

## Sources

- [zaozhuang.iqilu.com](https://zaozhuang.iqilu.com/zzyaowen/2020/0927/4660096.shtml), 2020-09-27: "首次实现中国纯电动装载机的量产"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
