# Turner-Flatiron JV wins $2.27B San Diego airport terminal contract

A joint venture of Turner Construction and Flatiron Construction was awarded a $2.27 billion contract to build a new terminal at San Diego International Airport. Construction is scheduled to begin in late 2021, with 19 gates opening in 2025 and 11 more in 2027.

- Type: Contract
- Announced: 2020-09-23
- Where: San Diego, California, United States
- Value: $2.27B
- Status: announced
- Capacity: 1.2 million square feet, 30 gates
- Products: airport terminal construction
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [Turner Construction](https://endata.com/companies/21917.md) (partner)
- [Flatiron Construction Corp.](https://endata.com/companies/28573.md) (partner)
- [San Diego International Airport](https://endata.com/companies/50098.md) (customer)

## Sources

- [constructiondive.com](https://www.constructiondive.com/news/turner-flatiron-jv-wins-227b-san-diego-airport-contract/585713/), 2020-09-23: "A joint venture of New York City-based Turner Construction and Broomfield, Colorado-based Flatiron Construction has been named to build a new $2.27 billion airport terminal at San Diego International Airport."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
