# GE Renewable Energy to supply turbines for 500-MW Kundah pumped storage plant

Megha Engineering and Infrastructure Limited (MEIL) selected GE Renewable Energy to supply and commission four 125-MW pumped storage turbine-generator units for the 500-MW Kundah hydropower plant in Tamil Nadu, India. Commissioning is expected by September 2023.

- Type: Contract
- Announced: 2020-09-17
- Where: Nilgiris hills, Tamil Nadu, India, India
- Status: announced
- Capacity: 500 MW
- Products: pumped storage turbine-generator units
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Renewable Energy](https://endata.com/companies/3506.md) (supplier)
- [Tamil Nadu Generation and Distribution Corporation Ltd](https://endata.com/companies/28855.md) (partner)
- [Megha Engineering and Infrastructure Limited](https://endata.com/companies/50003.md) (customer)

## Sources

- [renewableenergyworld.com](https://www.renewableenergyworld.com/energy-storage/pumped-storage/meil-names-ge-renewable-energy-to-supply-turbines-for-500-mw-kundah-pumped-storage/), 2020-09-17: "MEIL has selected GE Renewable Energy to supply and commission four 125-MW fixed speed pumped storage turbine-generator units for the new Kundah hydropower plant in India."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
