# GE Renewable Energy produces first nacelle for Saint-Nazaire offshore wind farm

GE Renewable Energy, EDF Renewables and Enbridge celebrated the production of the first Haliade 150-6 MW nacelle for the Saint-Nazaire offshore wind farm at the Montoir-de-Bretagne assembly plant. The 80-turbine wind farm is expected to become operational in 2022.

- Type: New facility
- Announced: 2020-09-15
- Where: Montoir-de-Bretagne, France, France
- Jobs: 200
- Starts operating: 2022
- Status: under construction
- Capacity: 80 wind turbines, 6 MW each
- Products: Haliade 150-6 MW wind turbine nacelles
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Renewable Energy](https://endata.com/companies/3506.md)
- [EDF Renewables](https://endata.com/companies/5846.md) (customer)
- [EDF Renewables](https://endata.com/companies/5846.md) (partner)
- [Enbridge](https://endata.com/companies/29898.md) (customer)
- [Enbridge](https://endata.com/companies/29898.md) (partner)

## Sources

- [renewableenergymagazine.com](https://www.renewableenergymagazine.com/wind/ge-renewable-energy-edf-renewables-and-enbridge-20200917), 2020-09-17: "The nacelle, which contains the generator, is the first in a series of Haliade 150-6 MW wind turbines, produced for the Saint-Nazaire offshore wind farm, to be assembled by GE Renewable Energy at the Montoir-de-Bretagne production site."
- [obscon.com](https://obscon.com/?p=13), 2020-09-19: "Today, Jérôme Pécresse, President and CEO of GE Renewable Energy, as well as Bruno Bensasson, EDF Group Senior Executive Vice-President Renewable Energies, representing the consortium formed by EDF Renewables and Enbridge, celebrated the production of the first GE Renewable Energy nacelle, for the f"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
