# GE to expand Montoir plant with €60M investment

GE Renewable Energy will invest €60 million to expand its Montoir plant by 10,000 m² and add tooling, doubling the site's surface area.

- Type: Expansion
- Announced: 2020-09-15
- Where: Montoir, Loire-Atlantique, France
- Value: $70.0M (60.0M EUR)
- Jobs: 600
- Status: announced
- Capacity: 10,000 m² extension
- Products: wind turbine components
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [General Electric](https://endata.com/companies/1262.md)

## Sources

- [ouest-france.fr](https://www.ouest-france.fr/pays-de-la-loire/saint-nazaire-44600/loire-atlantique-la-premiere-eolienne-du-futur-parc-de-saint-nazaire-6974566), 2020-09-15: "60 millions d’euros pour une extension de 10 000 m² et de l’outillage."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
