# Eaton plans $24M expansion of Badger Drive plant in Waukesha

Eaton will spend $24 million to expand its factory at 2300 Badger Drive in Waukesha by 233,000 square feet, increasing production of regulators and transformers. The expansion will consolidate employees from two other plants, resulting in over 700 employees at the site, but 33 positions will be eliminated.

- Type: Expansion
- Announced: 2020-09-12
- Where: Waukesha, Wisconsin, United States
- Value: $24.0M
- Jobs: 150
- Status: announced
- Capacity: 233000 sq ft
- Products: regulators, transformers
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Eaton](https://endata.com/companies/2829.md)

## Sources

- [gmtoday.com](https://www.gmtoday.com/business/eaton-plans-24m-expansion-of-badger-drive-plant-in-waukesha/article_e01bfe72-f501-11ea-80fe-93e9efefd069.html), 2020-09-12: "This expansion is part of the Eaton Power Systems Division long-term strategy to increase our volume and meet the needs of our customers."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
