# Alageum Electric to build electrical equipment plant in North Kazakhstan

Alageum Electric will launch a plant for producing electrical equipment in the North Kazakhstan region, with a total cost of 7 billion tenge. The plant will create about 300 jobs and is expected to start operating in the 3rd quarter of 2021.

- Type: New facility
- Announced: 2020-08-14
- Where: North Kazakhstan region, Petropavlovsk, Kazakhstan
- Jobs: 300
- Starts operating: Q3 2021
- Status: under construction
- Capacity: 13,000 electrical equipment annually
- Products: electrical equipment
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Alageum Electric](https://endata.com/companies/22004.md)

## Sources

- [invest.gov.kz](https://invest.gov.kz/media-center/press-releases/electrical-plant-to-be-built-in-north-kazakhstan-region-by-kazakh-investor/), 2020-08-14: "The plant will be one of the most modern and technologically advanced in the CIS."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
