# Framatome wins reactor protection system contract for Kursk NPP II in Russia

Framatome secured a contract to supply the reactor protection system for units 1 and 2 of Kursk Nuclear Power Plant II, including 45 TELEPERM XS I&C cabinets. Installation is expected to be completed by the end of 2025.

- Type: Contract
- Announced: 2020-04-09
- Where: Kursk, Russia
- Status: announced
- Capacity: 1.2GW per reactor unit
- Products: reactor protection system, I&C cabinets, supervisory services
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md), [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Framatome](https://endata.com/companies/3370.md) (supplier)
- [Rusatom Automated Control Systems](https://endata.com/companies/6348.md) (customer)

## Sources

- [power-technology.com](https://www.power-technology.com/news/framatome-wins-reactor-protection-system-contract-for-russian-npp/), 2020-04-09: "Framatome has secured a contract to support the Kursk Nuclear Power Plant (NPP) II in Russia."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
