# ACCIONA wins two express road contracts in Poland worth €642M

ACCIONA, in consortium with its Polish subsidiary Mostostal Warszawa, has been awarded contracts for the design and construction of two express roads in Poland: the S19 Expressway (€500 million) and the S7 road near Warsaw (€142 million).

- Type: Contract
- Announced: 2020-07-17
- Where: Poland
- Value: $730.0M (642.0M EUR)
- Status: completed
- Products: express roads, highways
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [ACCIONA](https://endata.com/companies/15903.md)
- [Mostostal Warszawa](https://endata.com/companies/25681.md) (partner)

## Sources

- [transportadvancement.com](https://www.transportadvancement.com/news/acciona-wins-two-express-roads-contracts-in-poland-for-e642-million/), 2020-07-17: "ACCIONA, in consortium with its Polish subsidiary Mostostal Warszawa, has been awarded the design and construction of a 10,3Km stretch of the country’s S19 Expressway."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
