# Bairds Malt expands Inverness malting plant with 57,000 mt capacity

Bairds Malt constructed a new malting plant at its Inverness facility on Longman Road, increasing capacity by 57,000 metric tonnes per annum. The plant became operational in 2023.

- Type: Expansion
- Announced: 2020-07-02
- Where: Inverness, Scotland, United Kingdom
- Starts operating: Oct 2020
- Status: completed
- Capacity: 57,000 metric tonnes per annum
- Products: malt
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Bairds Malt](https://endata.com/companies/48318.md)

## Sources

- [bairds-malt.co.uk](https://www.bairds-malt.co.uk/project-angel/), 2020-07-02: "Work is now complete at our Arbroath facility, with the refurbishment of the Clova malting plant, increasing production capacity by 22,000 metric tonnes (mt) per annum."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
