# BA Glass plans investments in Sofia production site

BA Glass plans to invest in its Sofia production site, including construction of a new production workshop with a glass melting furnace of 370 tonnes per day capacity, increasing the capacity of an existing furnace from 330 to 370 tonnes per day, and building new covered warehouses of 15,600 m2 and 32,520 m2.

- Type: Expansion
- Announced: 2020-06-17
- Where: Sofia, Bulgaria
- Starts operating: Q3 2021
- Status: announced
- Capacity: 370 tonnes per day (new furnace); 370 tonnes per day (existing furnace after expansion)
- Products: glass packaging
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [BA Glass](https://endata.com/companies/228.md)

## Sources

- [glassonline.com](https://www.glassonline.com/planned-investments-in-ba-glass-bulgaria-sa/), 2020-06-16: "The implementation of the investment project will not have a negative impact on the environment, because as a part of this investment, the operator will build a new treatment plant to reduce air emissions."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
