# Siemens Gamesa secures 20-year O&M contract for Senvion wind farm in Australia

Siemens Gamesa Renewable Energy secured a 20-year contract to provide full-scope operation and maintenance services for a 135-MW Senvion wind farm in Victoria, Australia.

- Type: Contract
- Announced: 2020-06-15
- Where: Victoria, Australia
- Status: announced
- Capacity: 135 MW
- Products: wind turbine operation and maintenance services
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Siemens Gamesa Renewable Energy](https://endata.com/companies/3169.md) (supplier)

## Sources

- [windsystemsmag.com](https://www.windsystemsmag.com/siemens-gamesa-sets-foundations-for-service-growth/), 2020-06-15: "Siemens Gamesa Renewable Energy has secured a long-term, 20-year contract to provide full-scope operation and maintenance services for a 135-MW Senvion wind farm in Victoria, Australia."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
