# Harbin Electric to build steam turbine plant in Kaluga region, Russia

Harbin Electric Corporation will build a plant in the Lyudinovo site of the Kaluga SEZ to produce steam turbines and turbogenerators for power units, with an investment of 10 billion rubles and creating about 300 jobs. The agreement was signed on June 3, 2020.

- Type: New facility
- Announced: 2020-06-03
- Where: Lyudinovo, Kaluga Oblast, Russia
- Value: $140.0M (10.0B RUB)
- Jobs: 300
- Status: announced
- Products: steam turbines, turbogenerators, steam boilers
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Harbin Electric](https://endata.com/companies/3291.md)

## Sources

- [mkkaluga.ru](https://www.mkkaluga.ru/economics/2020/06/03/zavod-parovykh-turbin-za-10-mlrd-rubley-postroyat-pod-kalugoy.html), 2020-06-03: "Харбинская электрическая корпорация построит на людиновской площадке ОЭЗ "Калуга" завод по производству паровых турбин и турбогенераторов для энергоблоков."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
