# Texas Instruments begins construction of $3.1B 12-inch wafer fab in Richardson, Texas

Texas Instruments began construction of a new 870,000-square-foot 12-inch wafer fab in Richardson, Texas, with a planned total investment of $3.1 billion. The facility is expected to start operations in 2024 and will create 625 jobs.

- Type: New facility
- Announced: 2020-06-03
- Where: Richardson, Texas, United States
- Value: $3.10B
- Jobs: 625
- Starts operating: 2024
- Status: under construction
- Products: semiconductor chips for smartphones, connected cars, and industrial machinery
- Sectors: [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md)

## Companies

- [Texas Instruments](https://endata.com/companies/29167.md)

## Sources

- [xcc.com](https://www.xcc.com/news/detail/2598093), 2020-06-03: "德州仪器全新的工厂占地870,000平方英尺，计划投资总额为31亿美元，其建设计划在2021年之前完成工厂的建造，并于2024年开始运营。"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
