# HRC to build advanced aeronautic composite parts production center in Changshu, China

HRC signed an investment agreement with the Changshu local government to establish a serial production center for advanced composite parts for the aeronautic and railway industries. Phase I will have a production area of 20,000 sqm with a registered capital of USD 33.8 million.

- Type: New facility
- Announced: 2020-06-02
- Where: Changshu, China
- Value: $33.8M
- Status: announced
- Products: advanced composite parts for aeronautic and railway industries
- Sectors: [Aerospace Components](https://endata.com/sectors/aerospace-components.md)

## Companies

- [HRC](https://endata.com/companies/47653.md)

## Sources

- [grouphrc.com](https://www.grouphrc.com/news/hrc-invested-in-new-serial-production-center-of-advanced-aeronautic-composite-parts-in-changshu), 2020-06-03: "HRC has officially signed a new investment agreement with the local government to invest and establish a brand-new serial production center for the manufacturing of advanced composite parts."
- [compositesworld.com](https://www.compositesworld.com/news/hrc-invests-in-new-serial-production-center-in-china), 2020-09-04: "HRC signed a new investment agreement with the local Chinese government to invest and establish a new serial production center for the manufacturing of advanced composite parts in Changshu"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
