# Hochtief consortium awarded €500M Duisburg bridge contract with German steel requirement

A consortium led by Hochtief Infrastructure GmbH was awarded the contract to build a cable-stayed bridge over the Rhine at Duisburg, with the requirement that 33,000 tonnes of steel be sourced in Germany. The project is valued at €500 million and is planned for completion in late 2026.

- Type: Contract
- Announced: 2020-05-27
- Where: Duisburg, Rhine river, Germany
- Value: $548.0M (500.0M EUR)
- Status: announced
- Products: steel bridge construction
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [Hochtief Infrastructure GmbH](https://endata.com/companies/47483.md)
- [MCE AT](https://endata.com/companies/47484.md) (partner)
- [MCE HU](https://endata.com/companies/47485.md) (partner)
- [MCE CZ](https://endata.com/companies/47486.md) (partner)
- [Zwickauer Sonderstahlbau GmbH](https://endata.com/companies/47487.md) (partner)
- [Plauen Stahl Technologie GmbH](https://endata.com/companies/47488.md) (partner)

## Sources

- [eurometal.net](https://eurometal.net/construction-of-german-autobahn-bridge-will-use-domestic-steel/), 2020-05-27: "The 33,000 tonnes of steel for the bridge will be sourced in Germany, to be fabricated in Germany, Hungary and the Czech Republic."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
