# Permasteelisa wins £62.3M facade contract for Battersea Power Station

Permasteelisa secured a £62.3 million contract for the design, supply and installation of facade work on Phase 3A of Battersea Power Station in London. Installation of the first panel is planned for Q2 2019.

- Type: Contract
- Announced: 2020-05-16
- Where: London, United Kingdom
- Value: $77.0M (62.3M GBP)
- Status: announced
- Products: building facade, glass panels, aluminum profiles
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [Permasteelisa](https://endata.com/companies/6464.md)

## Sources

- [constructiondigital.com](https://constructiondigital.com/epc/permasteelisa-seals-pound623m-contract-for-battersea-power-station-facade-work), 2020-05-16: "Permasteelisa seals £62.3m contract for Battersea Power Station facade work to transform Battersea Power Station’s phase 3A."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
