# Doosan Heavy Industries wins KRW400 billion order for Upper Trishuli-1 hydroelectric plant

Doosan Heavy Industries & Construction signed a KRW400 billion (US$356.3 million) contract with Nepal Water & Energy Development Co. to supply turbine and generator components and construct the 216-MW Upper Trishuli-1 Hydroelectric Power Plant in Nepal.

- Type: Contract
- Announced: 2020-05-11
- Where: Trishuli River, 70 km north of Kathmandu, Nepal
- Value: $356.3M (400.0B KRW)
- Status: announced
- Capacity: 216 MW
- Products: turbine, generator, hydroelectric power plant construction
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Doosan Heavy Industries & Construction](https://endata.com/companies/997.md)
- [Nepal Water & Energy Development Company](https://endata.com/companies/9002.md) (customer)

## Sources

- [nwedcpl.com](https://nwedcpl.com/doosan-heavy-industries-wins-order-for-216-mw-upper-trishuli-1-hydroelectric-plant/), 2020-05-11: "the company signed a KRW400 billion (US$356.3 million) contract with Nepal Water & Energy Development Co. (NWEDC)."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
