# MHPS receives order from Baotou Steel for two GTCC power units

Mitsubishi Hitachi Power Systems (MHPS) has received an order from Baotou Iron and Steel Group for two 165 MW blast furnace gas-fired gas turbine combined cycle generating units. Shipments to China are planned to begin in 2021.

- Type: Contract
- Announced: 2020-04-14
- Where: Inner Mongolia Autonomous Region, China
- Status: announced
- Capacity: 330 MW (2 x 165 MW)
- Products: blast furnace gas-fired GTCC generating units, M701S (DA) X series gas turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Mitsubishi Hitachi Power Systems](https://endata.com/companies/1024.md)
- [Mitsubishi Hitachi Power Systems](https://endata.com/companies/1024.md) (supplier)
- [Baotou Iron and Steel Group](https://endata.com/companies/46508.md) (customer)

## Sources

- [acnnewswire.com](https://www.acnnewswire.com/press-release/english/58539/mhps-receives-order-from-china's-baotou-steel-for-two-blast-furnace-gas-fired-gas-turbine-combined-cycle-(gtcc)-power-generating-units), 2020-04-14: "This is the third expansion project for Baotou Steel Group since 2005; shipments to China are planned to begin in 2021."
- [nsenergybusiness.com](https://www.nsenergybusiness.com/contracts/mhps-two-165mw-gtcc/), 2020-04-15: "BFG-fired GTCC units, which utilize the gas byproducts emitted from steelworks are an effective means to reduce the environmental impact and significantly contribute to efficient energy usage."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
