# MHPS receives order for three GTCC power units at JERA Anegasaki Thermal Power Station

Mitsubishi Hitachi Power Systems (MHPS) received a full turnkey EPC contract from JERA Power Anegasaki to replace aging units with three 650 MW-class GTCC facilities using M701JAC gas turbines. Total output 1,950 MW, operations starting from early 2023.

- Type: Contract
- Announced: 2020-03-18
- Where: Ichihara City, Chiba Prefecture, Japan
- Status: announced
- Capacity: 1,950 MW total output
- Products: gas turbine combined cycle power generating facilities, M701JAC gas turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Mitsubishi Hitachi Power Systems](https://endata.com/companies/1024.md) (supplier)
- [Mitsubishi Electric](https://endata.com/companies/2378.md) (partner)
- [JERA Power Anegasaki](https://endata.com/companies/45995.md) (customer)

## Sources

- [asianspectator.com](https://www.asianspectator.com/index.php/news/acn-business-news/13054-mhps-jera-power-anegasaki-orders-three-cutting-edge-1-650-deg-c-mhps-m701jac-type-gtcc-power-generating-facilities), 2020-03-18: "MHPS has received an order and begun work on a full turnkey contract for construction of new Units 1-3 at the Anegasaki Thermal Power Station."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
