# Huansheng PV starts construction of 3GW solar module plant in Yixing

Huansheng PV (a subsidiary of Zhonghuan Semiconductor) started construction of a 3GW G12 high-efficiency shingled solar module production line in Yixing, Jiangsu, with an investment of CNY 3 billion. Production is expected to start in Q3 2020.

- Type: New facility
- Announced: 2020-02-28
- Where: Yixing, Jiangsu, China
- Value: $430.0M (3.00B CNY)
- Starts operating: Q3 2020
- Status: under construction
- Capacity: 3 GW per year (solar modules)
- Products: G12 high-efficiency shingled solar modules
- Sectors: [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md)

## Companies

- [Huansheng PV](https://endata.com/companies/45763.md)
- [Zhonghuan Semiconductor](https://endata.com/companies/27790.md) (partner)

## Sources

- [21ic.com](https://www.21ic.com/article/696667.html), 2020-03-06: "环晟光伏3GW G12高效叠瓦太阳能电池组件一期项目，盘活闲置土地厂房，将再现当年开工、当年投产的“中环速度”。"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
