# KION Group and Weichai Power to build €100M forklift plant in Jinan, China

KION Group announced a joint venture with Weichai Power to build a new plant in Jinan, China, with total investment of about €100 million. KION holds 95% and Weichai 5%. The plant will produce counterbalance forklifts and is expected to start construction by end of 2020 and production in 2022, creating over 800 jobs by 2025.

- Type: New facility
- Announced: 2020-03-03
- Where: Jinan, Shandong, China
- Value: $110.0M (100.0M EUR)
- Jobs: 800
- Starts operating: 2022
- Status: announced
- Products: counterbalance forklifts
- Sectors: [Material Handling](https://endata.com/sectors/material-handling.md)

## Companies

- [KION Group](https://endata.com/companies/16287.md)
- [Weichai Power](https://endata.com/companies/4175.md) (partner)
- [KION Group](https://endata.com/companies/16287.md) (partner)

## Sources

- [xinhuanet.com](https://www.xinhuanet.com/world/2020-03/03/c_1125658411.htm), 2020-03-03: "济南新厂建设投资总额约1亿欧元，新厂预计2020年底动工，2022年投产，主要生产平衡重式叉车。"
- [mm-logistik.vogel.de](https://www.mm-logistik.vogel.de/kion-baut-neues-staplerwerk-in-china-a-910066/), 2020-03-03: "Mit dem Bau eines Werkes für Gegengewichtsstapler im ostchinesischen Jinan investiert der Konzern massiv in die Zukunft."
- [en.imsilkroad.com](https://en.imsilkroad.com/p/311678.html), 2020-03-04: "Construction on the new plant is expected to start from the end of 2020 and it will be put into production in 2022."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
