# Toupret invests EUR 14 million in new plant and logistics hub in Tigery, France

Toupret is investing EUR 14 million in a new production unit for paste coatings and a logistics hub in Tigery, France, with the plant scheduled to be commissioned in May 2020.

- Type: New facility
- Announced: 2020-02-26
- Where: Tigery, France, France
- Value: $15.2M (14.0M EUR)
- Starts operating: May 2020
- Status: under construction
- Products: paste coatings, wall preparation coatings
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [Toupret](https://endata.com/companies/45531.md)

## Sources

- [batinfo.com](https://batinfo.com/en/actuality/toupret-invests-14-million-euros-in-its-3rd-industrial-site-in-france_14902), 2020-02-26: "This new 91-square-meter Tigery (11000) plant, which is scheduled to be commissioned in May 2020, will strengthen the Group's production of paste coatings."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
