# Centrisys completes $67M centrifuge upgrade at two NYC wastewater plants

Centrisys completed a $67 million upgrade, installing 32 decanter centrifuges at the Wards Island and Hunts Point wastewater treatment plants in New York City, reducing energy consumption by 60%.

- Type: Contract
- Announced: 2020-02-24
- Where: New York City, New York, United States
- Value: $67.0M
- Starts operating: 2 Mar 2020
- Status: completed
- Products: decanter centrifuges
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Centrisys Corporation](https://endata.com/companies/32943.md)
- [New York City Department of Environmental Protection](https://endata.com/companies/40788.md) (customer)

## Sources

- [centrisys-cnp.com](https://www.centrisys-cnp.com/press-releases/centrisys-completes-wastewater-resource-recovery-efficiency-updates-in-two-new-york-locations), 2020-02-24: "Centrisys/CNP announced today that the $67M comprehensive energy-efficient upgrade at two of New York City's largest wastewater treatment plants is now complete."
- [wateronline.com](https://www.wateronline.com/doc/centrisys-wastewater-resource-recovery-efficiency-updates-new-york-locations-0001), 2020-03-02: "The new Centrisys centrifuges will consume 60% less electricity, and reduce 826 metric tons of greenhouses gases annually between the two plants."
- [waterworld.com](https://www.waterworld.com/wastewater-treatment/article/14168952/centrisys-completes-wastewater-resource-recovery-efficiency-updates-in-two-ny-locations), 2020-03-02: "The $67M comprehensive energy-efficient upgrade at two of New York City’s largest wastewater treatment plants is now complete."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
