# Offsite Solutions wins £2.5M contract for shower pods at Moda Living's Lexington tower in Liverpool

Offsite Solutions has won a £2.5 million contract to manufacture 478 steel-framed shower pods for Moda Living's 34-storey Lexington tower in Liverpool, UK. The £90 million development is scheduled for completion in 2021.

- Type: Contract
- Announced: 2020-01-30
- Where: Liverpool, UK, United Kingdom
- Value: $3.25M (2.50M GBP)
- Status: announced
- Capacity: 478 shower pods
- Products: steel-framed shower pods
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [Offsite Solutions](https://endata.com/companies/33324.md) (supplier)
- [Moda Living](https://endata.com/companies/44881.md) (customer)
- [BCEGI](https://endata.com/companies/44882.md) (partner)

## Sources

- [theconstructionindex.co.uk](https://www.theconstructionindex.co.uk/news/view/offsite-solutions-supplies-shower-pods-to-second-moda-tower), 2020-01-30: "Bathroom pods give us the benefit of simplified logistics, reducing the number of subcontractors on site by around six trades."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
