# Hoban TBM wins KRW 102.9 billion GTX-A tunnel construction contract

Hoban TBM was awarded a KRW 102.9 billion contract for the Gripper TBM construction of Section 5 of the GTX-A railway line in Seoul, South Korea, covering a 4.4 km tunnel between Yeonsinnae and Seoul Station.

- Type: Contract
- Announced: 2020-01-20
- Where: Seoul, South Korea, South Korea
- Value: $87.0M (102.9B KRW)
- Status: announced
- Products: Gripper TBM tunnel boring machine, tunnel construction
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Hoban TBM](https://endata.com/companies/44645.md)

## Sources

- [biz.heraldcorp.com](https://biz.heraldcorp.com/article/2207194), 2020-01-20: "호반TBM이 수도권광역급행철도(GTX) A노선 5공구의 ‘그리퍼(Gripper) TBM’ 건설공사를 수주했다고 20일 밝혔다."
- [daily.hankooki.com](https://daily.hankooki.com/news/articleView.html?idxno=639198), 2020-01-20: "호반TBM은 수도권 광역급행철도(GTX) A노선 5공구의 그리퍼 TBM 건설공사를 수주했다고 20일 밝혔다."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
