# Monaco's wastewater treatment plant extension to cost €32 million

The Monégasque government is building an extension to the UTER wastewater treatment plant in Fontvieille, Monaco, costing €32 million, to increase processing capacity by 30% using MBBR technology.

- Type: Expansion
- Announced: 2020-01-09
- Where: Fontvieille, Monaco, MCO
- Value: $35.5M (32.0M EUR)
- Starts operating: Sep 2020
- Status: under construction
- Capacity: 30% increase in processing capacity
- Products: wastewater treatment
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [SMEaux](https://endata.com/companies/44417.md)

## Sources

- [monaco-tribune.com](https://www.monaco-tribune.com/en/2020/01/inside-monacos-e32-million-wastewater-plant/), 2020-01-09: "Construction works are taking place at the plant to build an extension that will increase the plant’s purification performance"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
