# CLARK Material Handling completes expansion of Lexington assembly facility

CLARK Material Handling Company completed the expansion of its manufacturing facility in Lexington, Kentucky, adding an 18,000 sq. ft. facility to increase assembly capacity for electric and internal combustion forklifts.

- Type: Expansion
- Announced: 2019-12-02
- Where: Lexington, Kentucky, United States
- Starts operating: 2 Dec 2019
- Status: completed
- Capacity: 18,000 sq. ft.
- Products: forklift trucks, spare parts
- Sectors: [Material Handling](https://endata.com/sectors/material-handling.md)

## Companies

- [Clark Material Handling Company](https://endata.com/companies/37364.md)

## Sources

- [clarkmhc.com](https://www.clarkmhc.com/clark-material-handling-company-completes-expansion-of-lexington-kentucky-assembly-facility/), 2019-12-02: "With the opening of this new facility, we’re marking an important step toward our future growth."
- [smileypete.com](https://smileypete.com/business/clark-material-handling-complete-expansion-of-its-third-lexi/), 2019-12-03: "Clark Material Handling Company announced the completed expansion of its third Lexington facility."
- [logisticsbusiness.com](https://logisticsbusiness.com/materials-handling/forklifts-warehouse-vehicles/clark-opens-assembly-plant-in-us-lexington-hq-2/), 2020-01-13: "With the inauguration of our new production facility, we have not only set the course for future growth, but with the help of this we have also been able to improve our entire operating processes, reduce waste and shorten throughput times."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
