# VA Tech WABAG inaugurates 45 MLD tertiary treatment plant in Chennai

VA Tech WABAG Ltd inaugurated a 45 million litres per day tertiary treatment reverse osmosis plant at Koyambedu, Chennai, built at a cost of ₹486.21 crore. The plant will treat sewage to drinking water standards for industrial reuse, with a provision to expand to 60 MLD.

- Type: New facility
- Announced: 2019-11-29
- Where: Koyambedu, Chennai, India
- Value: $68.0M (48.6B INR)
- Starts operating: 29 Nov 2019
- Status: completed
- Capacity: 45 million litres per day
- Products: tertiary treatment reverse osmosis plant, treated sewage water for industrial reuse
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Va Tech Wabag](https://endata.com/companies/4508.md)
- [Chennai Metropolitan Water Supply and Sewerage Board](https://endata.com/companies/21207.md) (customer)
- [IDE Technologies](https://endata.com/companies/32541.md) (partner)

## Sources

- [thehindubusinessline.com](https://www.thehindubusinessline.com/news/national/chennai-gets-one-more-45-mld-tertiary-treatment-plant-to-recycle-sewage/article30118176.ece), 2019-11-29: "India’s largest tertiary treatment reverse osmosis plant was inaugurated on Thursday at Koyambedu in the heart of the city by Chief Minister Edappadi K Palaniswami."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
