# Gree Electric starts construction of refrigerator and washing machine base in Changsha

Gree Electric's third-phase refrigerator and washing machine production base in Changsha broke ground on November 19, 2019, with a planned construction area of 961 mu and an annual design capacity of 4.5 million units.

- Type: New facility
- Announced: 2019-11-19
- Where: Changsha, Hunan, China
- Value: $436.0M (3.00B CNY)
- Starts operating: May 2012
- Status: under construction
- Capacity: 4.5 million units per year
- Products: refrigerators, washing machines
- Sectors: [HVAC and Industrial Refrigeration](https://endata.com/sectors/hvac-refrigeration.md)

## Companies

- [Gree Electric Appliances](https://endata.com/companies/16114.md)

## Sources

- [news.cnstock.com](https://news.cnstock.com/event,2017mzpp-201911-4455494.htm), 2019-11-22: "格力电器（长沙）冰箱洗衣机生产基地（长沙格力三期项目）计划动工建设用地961亩"
- [govt.chinadaily.com.cn](https://govt.chinadaily.com.cn/s/201912/21/WS5dfe1c76498e1ed196a6b5a1/gree-industrial-park.html), 2019-12-21: "Gree Industrial Park, the eighth Gree production base in the world, covers an area of 1,400 mu (93.33 hectares)."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
