# Gree Electric's Changsha large central air-conditioning project starts production

Gree Electric's second-phase large central air-conditioning project in Changsha, China, officially started production on November 19, 2019, with an annual design capacity of 50,000 units. The third-phase refrigerator and washing machine production base also broke ground, with an annual design capacity of 4.5 million units.

- Type: Expansion
- Announced: 2019-11-19
- Where: Changsha, Hunan, China
- Starts operating: 19 Nov 2019
- Status: completed
- Capacity: 50,000 units per year (central AC); 4.5 million units per year (refrigerators and washing machines)
- Products: large central air-conditioning units, refrigerators, washing machines
- Sectors: [HVAC and Industrial Refrigeration](https://endata.com/sectors/hvac-refrigeration.md)

## Companies

- [Gree Electric Appliances](https://endata.com/companies/16114.md)

## Sources

- [news.cnstock.com](https://news.cnstock.com/event,2017mzpp-201911-4455494.htm), 2019-11-22: "本次下线产品是获得“国际领先”认证的格力磁悬浮离心式冷水机组"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
