# BWXT awarded $806M long-lead material contract for naval reactor components

BWX Technologies subsidiary BWXT Nuclear Operations Group was awarded a contract with options totaling approximately $806 million by the U.S. Naval Nuclear Propulsion Program for long-lead materials for naval reactor components.

- Type: Contract
- Announced: 2019-10-17
- Where: United States
- Value: $806.0M
- Status: announced
- Products: naval reactor components
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [BWX Technologies](https://endata.com/companies/3013.md)
- [U.S. Naval Nuclear Propulsion Program](https://endata.com/companies/3015.md) (customer)

## Sources

- [bwxt.com](https://www.bwxt.com/bwxt-awarded-806-million-long-lead-material-contract-in-support-of-naval-reactors-manufacturing/), 2019-10-17: "BWX Technologies, Inc. announced today that the U.S. Naval Nuclear Propulsion Program has awarded subsidiary BWXT Nuclear Operations Group, Inc. a contract with options totaling approximately $806 million for the procurement of long-lead materials required for the manufacture of naval reactor compon"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
