# Saint-Gobain invests EUR 20 million in glass production line upgrade in Calarasi, Romania

Saint-Gobain invested over EUR 20 million to refurbish glass production lines at its plant in Calarasi, Romania. The investment was completed in four months, resulting in higher production capacity and lower energy consumption. Current capacity is 21 million square meters of glass annually.

- Type: Expansion
- Announced: 2019-10-07
- Where: Calarasi, Romania, Romania
- Value: $22.0M (20.0M EUR)
- Starts operating: 7 Oct 2019
- Status: completed
- Capacity: 21 million square meters of glass annually
- Products: glass
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [Saint-Gobain](https://endata.com/companies/1801.md)

## Sources

- [romania-insider.com](https://www.romania-insider.com/saint-gobain-refurbishment-calarasi-plant), 2019-10-07: "It is the kind of refurbishment that is done every 15 years."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
