# Siemens Gamesa conditionally awarded 130 MW South Fork offshore wind turbine contract

Siemens Gamesa was conditionally awarded the contract to deliver SG 8.0-167 DD offshore wind turbines for the 130 MW South Fork offshore wind project, expected to be operational by the end of 2022.

- Type: Contract
- Announced: 2019-09-15
- Where: 35 miles off Long Island, New York, United States
- Status: announced
- Capacity: 130 MW
- Products: SG 8.0-167 DD offshore wind turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Siemens Gamesa Renewable Energy](https://endata.com/companies/3169.md) (supplier)

## Sources

- [windsystemsmag.com](https://www.windsystemsmag.com/siemens-gamesa-awarded-largest-u-s-offshore-order-to-date/), 2019-09-15: "SGRE was conditionally awarded the contract to deliver SG 8.0-167 DD offshore wind turbines for the 130 MW South Fork offshore wind-power project."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
