# CPI Aero receives $23.3M contract from Raytheon for NGJ-MB pod structures

Raytheon authorized CPI Aerostructures to begin production of pod structures and air-management system components for the Next Generation Jammer Mid-Band program. The contract has a maximum value of $23.3 million, with deliveries expected from August 2020 to first half of 2021.

- Type: Contract
- Announced: 2019-09-05
- Where: Edgewood, N.Y., United States
- Value: $23.3M
- Status: announced
- Products: pod structures, air-management system components, electronic attack weapon system
- Sectors: [Aerospace Components](https://endata.com/sectors/aerospace-components.md), [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md)

## Companies

- [Raytheon](https://endata.com/companies/19863.md) (customer)
- [CPI Aerostructures](https://endata.com/companies/21504.md) (supplier)

## Sources

- [old.seapowermagazine.org](https://old.seapowermagazine.org/raytheon-oks-next-phase-of-next-generation-jammer-mid-band-program/), 2019-09-06: "CPI Aero has been a key supplier to Raytheon on this program since 2016, and we are proud to play an important role in getting this critical electronic warfare capability into the hands of the U.S. Navy for testing."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
