# B. Braun expands high-bay warehouse in Berlin with Hörmann Logistik

B. Braun is extending its high-bay warehouse in Berlin by two aisles and replacing conveyor technology. Hörmann Logistik received the order as general contractor for the two-phase project, which includes new stacker cranes and conveyor systems.

- Type: Expansion
- Announced: 2019-09-01
- Where: Berlin, Germany
- Status: announced
- Products: high-bay warehouse, conveyor technology, stacker cranes
- Sectors: [Material Handling](https://endata.com/sectors/material-handling.md)

## Companies

- [B.Braun](https://endata.com/companies/2651.md)
- [Hörmann Logistik](https://endata.com/companies/22220.md) (partner)

## Sources

- [hoermann-intralogistics.com](https://www.hoermann-intralogistics.com/en/news/newsmeldung/construction-a-new-high-bay-warehouse-process-optimization-and-replacement), 2019-09-01: "At the Berlin site, the existing high-bay warehouse (HRL) is to be extended by two aisles and the current conveyor technology is to be replaced."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
