# Doosan Heavy wins $100.6M order to supply boilers and turbines for Indonesia's Palu 3 plant

Doosan Heavy Industries & Construction won a 120 billion won ($100.6 million) order from PLN to supply CFB boilers and turbines for the 110 MW Palu 3 thermal power plant on Sulawesi, Indonesia, with installation by 2023.

- Type: Contract
- Announced: 2019-09-09
- Where: Sulawesi, Indonesia
- Value: $100.6M (120.0B KRW)
- Status: announced
- Capacity: 110 megawatts
- Products: circulating fluidized bed boilers, turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md), [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Doosan Heavy Industries & Construction](https://endata.com/companies/997.md) (supplier)
- [PLN](https://endata.com/companies/5506.md) (customer)

## Sources

- [pulse.mk.co.kr](https://pulse.mk.co.kr/news/english/8974254), 2019-09-09: "Doosan Heavy Industries & Construction has won an order worth 120 billion won ($100.6 million) to supply boilers and turbines for a thermal power plant in Indonesia."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
