# Subsea 7's Seaway 7 wins cable installation contract for Hornsea Two offshore wind farm

Seaway 7, a subsidiary of Subsea 7, has secured a contract worth between $50 million and $150 million from Optimus Wind (Ørsted) to install the inner array grid cable system for the 1,386 MW Hornsea Two offshore wind farm in the UK North Sea.

- Type: Contract
- Announced: 2019-07-24
- Where: 90 km off the Yorkshire coast, North Sea, United Kingdom
- Value: $100.0M
- Status: announced
- Capacity: 1,386 MW
- Products: submarine cable installation services, inner array grid cable system
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md), [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Subsea 7](https://endata.com/companies/1132.md)
- [Ørsted](https://endata.com/companies/3516.md) (customer)

## Sources

- [offshore-energy.biz](https://www.offshore-energy.biz/2019/07/24/subsea-7-bags-offshore-wind-farm-cable-contract-in-uk), 2019-07-24: "Subsea 7’s Seaway 7 has secured a sizeable contract for the Hornsea Two offshore wind farm project by Optimus Wind, a subsidiary of the Ørsted Group, for the installation of the entire inner array grid cable system."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
